infiniti Workshop Repair Guides

Infiniti Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 8250 > < Initial Inspection and Diagnostic Overview|Page 8248
Page 1
background image

Power Distribution Module: Scan Tool Testing and Procedures

Active Test

ACTIVE TEST

Operation Procedure

1. Touch "ACTIVE TEST" on "SELECT DIAG-MODE" screen.
2. Touch item to be tested, and check operation.
3. Touch "START".

Part 1

Part 2

4. Touch "STOP" while testing to stop the operation.

Data Monitor

DATA MONITOR

Operation Procedure

1. Touch "DATA MONITOR" on "SELECT DIAG MODE" screen.

2. Touch "ALL SIGNALS", "MAIN SIGNALS" or "SELECTION FROM MENU" on the "DATA MONITOR" screen.
3. Touch "START".
4. When "SELECTION FROM MENU" is selected, touch items to be monitored. When "ALL SIGNALS" is selected, all the items will be

monitored. When "MAIN SIGNALS" is selected, predetermined items are monitored.

5. Touch "RECORD" while monitoring to record the status of the item being monitored. To stop recording, touch "STOP".

Initial Inspection and Diagnostic Overview|Page 8250 > < Initial Inspection and Diagnostic Overview|Page 8248