jaguar Workshop Repair Guides

Jaguar Workshop Service and Repair Manuals

Left Hand|Page 1360 > < Left Hand|Page 1358
Page 3
background image

9. Install the camshaft locking tool 303-530 to Bank 2 camshafts, aligning the shafts slightly as

10. CAUTION:  Use a length of steel strip that will not fall into the timing cover.

Protect the upper face of the timing cover from scratches, when removing the bolt which secures the sprocket.
Place a flat piece of steel strip along the timing cover horizontal jointing face, adjacent to the exhaust camshaft sprocket.
Secure the steel strip in place with adhesive tape.

11. A ball-ended hexagon drive bit is required to remove the sprocket securing bolt.

Left Hand|Page 1360 > < Left Hand|Page 1358