Vanden Plas (X308) V8-4.0L (AJ27) (2000)
16. Remove nut securing upper wishbone ball joint to vertical link.
17. Release upper wishbone ball joint from vertical link/hub assembly.
Caution:
Do not special tool 211-098 in the following procedure as this will damage the ball joint gaiter.
1. Install special tool 204-192 on ball joint.
2. Tighten tool bolt to release ball joint taper pin from vertical link.
18. Raise upper wishbone to release ball joint pin from vertical link.