X-Type (X400) V6-2.5L (2005)
2. Tighten to 40 Nm.
3. Install new retaining studs.
-
Tighten to 9 Nm.
4. Tighten in the sequence shown to 25 Nm.
NOTE: Make sure that the retaining nuts are tightened twice in the sequence shown.
5. Tighten to 25 Nm.
6. Tighten to 10 Nm.