jaguar Workshop Repair Guides

Jaguar Workshop Service and Repair Manuals

Engine - Vibration Noise Above 1,000 Rpm|Page 1273 > < Engine - Vibration Noise Above 1,000 Rpm|Page 1271
Page 17
background image

66.

Secure the bank 1 timing chain tensioner in the vice jaws. (Illustration 43)

Caution

During timing chain tensioner compression, do not release the ratchet stem until the timing chain tensioner piston is fully bottomed in its bore or
damage to the ratchet stem will result.

67.

Using a suitable tool, hold the bank 1 timing chain tensioner ratchet lock mechanism away from ratchet stem. Slowly compress the bank 1 timing
chain tensioner. (Illustration 44)

Note:

The timing chain tensioner piston should retract with minimal force. If binding occurs, reposition the timing chain tensioner to eliminate side
loading.

68.

Using a suitable tool, retain bank 1 timing chain tensioner piston. (Illustration 45) Note: The retaining tool must remain in the timing chain
tensioner until the timing chain tensioner is installed to the engine with the piston bottomed in the bore.

Engine - Vibration Noise Above 1,000 Rpm|Page 1273 > < Engine - Vibration Noise Above 1,000 Rpm|Page 1271