XJ-Super V8 (X308) V8-4.0L SC (AJ27) (2002)
Control Arm Bushing: Service and Repair
Wishbone Bush - Upper
Wishbone Bush - Upper 60.35.35
Special Service tools
Ball Joint Taper Separator 204-192 (JD 219)
Front Camber Tie-down Link 204-114 (JD 133)
Removal
CAUTION:
Replacement of nuts and bolts: Various thread-locking devices are used on nuts and bolts throughout the vehicle. These devices restrict the
number of times a nut or bolt can be used.
1. Raise front of vehicle.
2. Position camber tie down special tool 204-114 on suspension.
^
Fully slacken tool adjuster nut.
^
Position tool in road spring and pass upper dowel through slot in suspension turret.
3. Lower front of vehicle.
4. Rotate stem of special tool 204-114 to locate dowel in suspension turret slot.
5. WARNING:
WHEN TIGHTENING TOOL NUT, USE LOWER DOWEL AS A GUIDE TO ENSURE THAT THE TOOL STEM DOES NOT ROTATE
AND DISTURB POSITION OF DOWEL IN SUSPENSION TURRET.
Fully tighten nut of special tool to achieve suspension mid-laden position.
6. Raise front of vehicle and support on stands.