XJ (X350) V8-4.2L (2005)
4. Align the roof opening panel frame using a 12 mm drill bit.
5. Tighten to 9 Nm.
NOTE: Left-hand shown, right-hand similar.
6. Install the rear drain hose.
NOTE: Left-hand shown, right-hand similar.
7. Install the front drain hose.
NOTE: Right-hand shown, left-hand similar.