XJ (X350) V8-4.2L (2005)
10. Release the tension in the left-hand timing chain tensioner.
^
Remove the retaining tool.
11. CAUTION: While applying the opposing force to sprocket and chain, tighten the sprocket bolt.
Using the special tool, apply force to the tool in an anti-clockwise direction to tension the primary timing chain on its drive side.
^
Tighten to 120 Nm.
12. CAUTION: While applying the opposing force to sprocket and chain, tighten the sprocket bolt.
Using the special tool, apply force to the tool in an anti-clockwise direction.
^
Tighten to 120 Nm.
13. Install the primary timing chain guide.
^
Tighten to 12 Nm.
14. CAUTION: Make sure the timing chain slack is on the tensioned side of the timing chain.
Install the primary timing chain.
^
Install the primary chain over the crankshaft sprocket and the intake sprocket.