XJ (X350) V8-4.2L (2005)
2. Attach the upper arm.
Tighten to 90 Nm
3. Attach the tie rod end.
Tighten to 75 Nm.
4. Install the stabilizer bar link.
5. Attach the stabilizer bar link.
Tighten to 43 Nm.
6. Install the brake disc shield.
7. NOTE: The final tightening of the stabilizer bar link retaining nut and bolt must be carried out with the vehicle on wheels.