XJR (X308) V8-4.0L SC (AJ26) (1998)
Variable Valve Timing Actuator: Service and Repair
Variable Valve Timing Unit - Bank 2
Removal
1. Open the engine compartment and fit paintwork protection sheets.
2. Set the engine compartment cover to the service access position.
3. Disconnect the battery ground cable.