XJR (X308) V8-4.0L SC (AJ26) (1998)
6. Reposition the clips, which secure the engine harness to the cam cover.
7. Install the on-plug ignition coils and the coil cover.
8. Install the intake tube/air flow meter/air cleaner cover assembly.
Install a new rubber seal; air intake tube to throttle body.
Install the intake tube/air flow meter/air cleaner cover assembly.
9. Reconnect the air cleaner cover.
Install the five clips, which secure the air cleaner cover.