XJR (X308) V8-4.0L SC (AJ26) (1998)
4. Install the fuel cross over elbow to the intake manifold.
Lubricate and install new O-ring seals to the cross over elbow.
Install the cross over elbow to the manifold.
Install the one bolt each side, which secures the cross over elbow. Tighten to 8-12 Nm.
5. Install the sealing rings to the fuel injectors.
Lubricate and install the sixteen (two to each injector) new sealing rings.
6. Install the fuel injectors to the intake manifold.
Locate the injectors into the manifold.
Position the injector clamping plates.
Install the securing screws for each fuel injector. Tighten to 4-6 Nm.