XJR (X308) V8-4.0L SC (AJ26) (1998)
2. Tighten tool bolt to release ball joint taper pin from vertical link.
22. Remove vertical link/bearing assembly
23. Remove special tool 204-293
24. Clean all suspension to vertical link/hub assembly mating surfaces
25. Repeat procedure steps 2 to 24 on opposite side of vehicle
Installation
1. Position modified vertical link/hub assembly on upper ball joint taper pin.
2. Position vertical link/hub assembly on lower ball joint taper pin, install securing nut and tighten to 60-80 Nm.