XK-8 Convertible (X100) V8-4.0L (AJ27) (2001)
7. NOTE: Note the position of the header rail weatherstrip right-hand insulator.
Remove and discard the header rail weatherstrip right-hand insulator.
8. NOTE: Note the position of the header rail weatherstrip right-hand locating channel insulator.
Remove and discard the header rail weatherstrip right-hand locating channel insulator.
9. Remove the header rail weatherstrip left-hand retaining screw.
10. Detach the header rail weatherstrip left-hand upper retaining clip.
11. Detach the header rail weatherstrip left-hand lower retaining clips.