XK-8 Coupe (X100) V8-4.0L (AJ26) (1998)
16. Install the throttle body.
Install a new gasket to the throttle body.
Position the throttle body to the induction elbow.
17. Install the throttle body securing bolts. Tighten to 18-24 Nm.
18. Reconnect the multi-plug, located on the bracket under the left side of the throttle body.