XK-8 Coupe (X100) V8-4.0L (AJ26) (1998)
Install washer and nut and tighten nut to 98 - 132 Nm.
7. Remove wire/string temporarily securing vertical link to damper.
8. Position wishbone to facilitate engagement of ball joint taper pin in vertical link.
9. Install nut securing ball joint to vertical link and tighten nut to 60 - 80 Nm.