XK (X100) V8-4.2L (2005)
Installation
1. CAUTION: Make sure all adhesive has been removed from the insulator mating surfaces.
NOTE:
-
Install the header rail weatherstrip to the position noted during removal.
-
Install new header rail weatherstrip locating channel insulators to the positions noted during removal.
-
Install new header rail weatherstrip insulators to the positions noted during removal.
To install, reverse the removal procedure.