XK (X150) V8-4.2L (2008)
-
Position the generator aside to access the engine wiring harness clips.
44. RH side: Release the engine wiring harness.
-
Release the 5 clips.
45. Remove the engine wiring harness.
Installation
1. Install the engine wiring harness.
2. RH side: Attach the wiring harness.
-
Secure the clips.
3. Install the generator.
-
Tighten the nut to 25 Nm (18 lb.ft).
-
Tighten the nut and bolt to 40 Nm (30 lb.ft).
4. Connect the generator electrical connectors.
-
Tighten the nut to 12 Nm (9 lb.ft).
-
Secure the cover.
5. Install the generator cooling duct.
-
Tighten the screws.
6. Connect the engine oil temperature sensor electrical connector.
7. Connect the EOP sensor electrical connector.
8. Connect the starter motor solenoid electrical connector.
-
Tighten the new nut to 7 Nm (5 lb.ft).
9. Connect the starter motor battery positive and generator cables.
-
Tighten the nut to 10 Nm (7 lb.ft).
-
Secure the cover.
10. Connect the CKP sensor electrical connector.
11. Connect and secure the HO2S electrical connectors.
-
Secure the 2 clips.
12. Connect the A/C compressor electrical connector.
13. LH side: Attach the wiring harness.
-
Secure the clips.
14. Install the power steering pump mounting bracket.
-
Tighten the bolts to 25 Nm (18 lb.ft).