XKR Convertible (X100) V8-4.0L SC (AJ27) (2001)
4. Connect vacuum pipe to intake elbow.
5. Install right-hand support bracket to intake elbow
1. Install bolt.
6. Install exhaust gas re-circulation valve (EGR) if applicable.
7. Install throttle assembly.
8. Install air cleaner cover/intake assembly.
9. Reconnect battery ground cable.