jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Camshaft|Page 1039 > < Camshaft
Page 2
background image

Fig.45 Timing Case Cover Components

12. Install the vibration damper.
13. Install the hydraulic valve tappets.
14. Install the cylinder head gasket with the numbers facing up.
15. Install the cylinder head and head bolts.
16. Install the push rods.
17. Install the rocker arms and pivot and bridge assemblies. Tighten each of the capscrews for each bridge alternately, one turn at a time, to avoid

damaging the bridge.

18. Install the engine cylinder head cover.
19. Position the oil pump gear.
20. Install the distributor and ignition wires..
21. Install the serpentine drive belt and tighten to the specified tension.

NOTE:  During installation, lubricate the hydraulic valve tappets and all valve components with Mopar Engine Oil Supplement, or equivalent.
The Mopar Engine Oil Supplement, or equivalent must remain with the engine oil for at least 1609 km (1,000 miles).The oil supplement need not
be drained until the next scheduled oil change.

22. Install the A/C condenser and receiver/drier assembly, if equipped.

CAUTION:  Both service valves must be opened before the air conditioning system is operated.

23. Install the radiator, connect the hoses and fill the cooling system to the specified level.

24. Check the ignition timing and adjust as necessary.
25. Install the grille and bumper, if removed.
26. Connect negative cable to battery.

Camshaft|Page 1039 > < Camshaft