jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Sound Proofing / Insulation > < Full Open Switch - Removal|Page 8628
Page 2
background image

3. Carefully install the full open switch wire harness routing clips (2) into the power liftgate drive unit assembly (1).

4. Insert the full open switch wire terminals (2) into the liftgate drive unit connector (1) ensuring the proper terminal location as noted in the full open

switch removal procedure.

5. Install the power liftgate drive unit assembly on the vehicle, See: Doors, Hood and Trunk/Trunk / Liftgate/Trunk / Liftgate Motor/Service and

Repair/Power Liftgate Drive Unit Motor - Installation.

6. Connect the battery negative cable.
7. Using an appropriate scan tool, check and erase any power liftgate control module diagnostic trouble codes.
8. Perform the power liftgate learn cycle, See: Doors, Hood and Trunk/Trunk / Liftgate/Testing and Inspection/Programming and Relearning.
9. Verify power liftgate system operation.

Sound Proofing / Insulation > < Full Open Switch - Removal|Page 8628