jeep Workshop Repair Guides

Jeep Workshop Service and Repair Manuals

Removal and Replacement|Page 4002 > < Removal and Replacement|Page 4000
Page 8
background image

LOWER VALVE BODY SECTION 2

4. Lubricate and install the 1-2 / 4-5 Overlap Regulating Valve, Sleeve, and Piston assembly (1), Shift Pressure Regulating Valve assembly (2),

Control Valve Pressure Regulator Valve assembly (3) and Shift Solenoid Pressure Regulating Valve assembly (4) into the valve body.

5. Install the side cover and the screws holding the side cover (5) to the valve body and valve housing. Tighten the screws to 4 Nm (35 in.lbs.).

NAG1 VALVE BODY SPRING DIMENSION

Removal and Replacement|Page 4002 > < Removal and Replacement|Page 4000