Workshop Repair Manuals

Jeep Workshop Manuals

[PREV PAGE] [NEXT PAGE]

jeep Workshop Repair Guides


Grand Cherokee 2WD V6-3.7L (2008)

Relays and Modules > Relays and Modules - Power and Ground Distribution > Power Distribution Module > Component Information > Service and Repair > Module-Integrated Power > Page 385

Page 2
background image

5. Using a suitable flat bladed tool, depress the three retaining clips and lift the IPM (1) straight up off of the bracket tabs (2).
6. Disconnect the two IPM connectors (4).
7. Disconnect the two Front Control Module (FCM) connectors (5).
8. Remove the IPM assembly from the vehicle.

Installation

INSTALLATION

NOTE: If replacing the Integrated Power Module (IPM) (1) with a new assembly it will be necessary to transfer the circuit protection devices
as well as the Front Control Module to the new IPM.

1. Position the IPM into the vehicle.
2. Connect the two Front Control Module (FCM) connectors (5).
3. Connect the two IPM connectors (4).
4. Position the IPM over the three bracket tabs (2) and apply downward pressure until the retaining clips snap into place securely.

Relays and Modules > Relays and Modules - Power and Ground Distribution > Power Distribution Module > Component Information > Service and Repair > Module-Integrated Power > Page 385

[PREV PAGE] [NEXT PAGE]