Grand Cherokee 2WD V8-4.7L Flex Fuel (2008)
1. Position the passenger side instrument panel duct and demister duct assembly (2) and the driver side instrument panel duct and demister duct
assembly (3) into the instrument panel top cover (1).
2. Connect the instrument panel ducts to the air outlets (5) and the main distribution duct (4). Make sure that the ducts are correctly installed over the
instrument panel and demister outlet seals.
3. Install the screws that secure the instrument panel ducts the instrument panel top cover. Tighten the screws to 2 Nm (17 in. lbs.).
4. Install the instrument panel top cover onto the instrument panel.
5. Install the instrument panel See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument Panel/Service and Repair/Instrument Panel -
Installation.
CENTER DUCTS
6. Position the center instrument panel duct(s) (2) into the instrument panel (3) through the opening for the radio.
7. Connect the center instrument panel duct(s) to the main distribution duct (4).
8. Install the screws (1) that secure the center instrument panel duct(s) to the instrument panel. Tighten the screws to 2 Nm (17 in. lbs.).
9. Install the radio into the instrument panel See: Accessories and Optional Equipment/Radio, Stereo, and Compact Disc/Radio/Stereo/Service and
Repair/Removal and Replacement/Installation.