Grand Cherokee 2WD V8-5.2L VIN Y (1998)
5.2L / 5.9L Intake Manifold Flange Bolt Torque Procedure
2.
With the engine reassembled, inspect the coil and spark plug wires for proper routing. Refer to TSB 09-48-98 for additional assistance.
3.
Start the engine and allow it to warm to normal engine operating temperature.
4.
Decarbon the combustion chamber using Mopar Combustion Chamber Conditioner (p/n 04318001) per the instructions.
NOTE:
ALLOW THE COMBUSTION CHAMBER CLEANER TO SOAK INSIDE OF THE ENGINE FOR 2 TO 2.5 HOURS.
NOTE:
A SECOND APPLICATION OF THE COMBUSTION CHAMBER CONDITIONER MAY BE REQUIRED IF THERE WAS A LARGE
QUANTITY OF OIL LEAKAGE PAST THE INTAKE PLENUM PAN GASKET.
5.
Verify proper engine oil level.
POLICY: Reimbursable within the provisions of the warranty.
Time Allowance
FAILURE CODE: P8- New Part