Grand Cherokee 2WD V8-5.7L VIN 2 (2005)
1. Place the turn signal cancel cam into the center of the SCM and firmly snap into place. There is an alignment dowel that will only let you install it
one way.
2. Install the right multi-function switch (2) by aligning the self docking connector. Push down firmly to snap switch into place. Install the two screws
(1). The left multi-function switch installs the exact same way.
3. Install the hazard switch (1) to the SCM (3) by firmly sliding the switch into position, into the tangs (2).
4. Install the SCM.
NOTE: IF EQUIPPED WITH ESP - recalibrate the steering angle sensor using the scan tool.