Patriot 4WD L4-2.4L VIN W (2007)
Shift Rail: Service and Repair
Installation
INSTALLATION
1. Line up replacement bushing in bore.
2. Using Installer MD998343, tap bushing into bore until flush with the chamfer in the case.
Shift Rail: Service and Repair
Installation
INSTALLATION
1. Line up replacement bushing in bore.
2. Using Installer MD998343, tap bushing into bore until flush with the chamfer in the case.