Wrangler 4WD L4-150 2.5L VIN P MFI (1998)
Blower Motor: Service and Repair
REMOVAL
1. Remove the battery from the battery tray. Refer to Starting and Charging/Battery for the procedures. See: Starting and Charging/Battery/Service
and Repair
Powertrain Control Module (PCM) Remove/Install
2. Remove the three screws that secure the Powertrain Control Module (PCM) to the mounting bracket on the engine compartment side of the dash
panel. Move the PCM away from the blower motor opening in the dash panel.
Blower Motor Remove/Install
3. Unplug the blower motor wire harness connector.
4. Remove the three screws that secure the blower motor and wheel assembly to the heater-A/C housing.
5. Rotate and tilt the blower motor unit as needed for clearance to remove the blower motor and wheel from the heater-A/C housing.
INSTALLATION
1. Align and install the blower motor and wheel assembly into the heater-A/C housing.
2. Install and tighten the three screws that secure the blower motor and wheel assembly to the heater-A/C housing. Tighten the mounting screws to
2.2 N.m (20 in. lbs.).
3. Plug in the blower motor wire harness connector.
4. Position the PCM to the mounting bracket on the dash panel. Install and tighten the three screws that secure the PCM to the dash panel mounting
bracket.
5. Install the battery in the battery tray. Refer to Starting and Charging/Battery for the procedures. See: Starting and Charging/Battery/Service and
Repair