Discovery II (LT) V8-4.0L (2002)
19. Remove 2 bolts securing inlet manifold gasket and collect gasket clamps.
20. Remove inlet manifold gasket.
21. Remove gasket seals.
Refit
1. Clean old RTV sealant from cylinder head and cylinder block notches.
2. Clean mating faces of cylinder block, cylinder head and inlet manifold.
3. Apply RTV sealant to cylinder head and cylinder block notches.
4. Fit new gasket seals, ensuring ends engage correctly in notches.
5. Fit new inlet manifold gasket.
6. Position gasket clamps and fit bolts, but do not tighten at this stage.
7. Position inlet manifold to engine. Fit manifold bolts and, working in the sequence shown, tighten bolts initially to 10 Nm (7 ft. lbs.) then to 51
Nm (38 ft. lbs.).
8. Tighten gasket clamp bolts to 18 Nm (13 ft. lbs.).
9. Connect fuel pipe.
10. Clean top hose outlet pipe mating faces.
11. Fit new 'O' ring to outlet pipe.
12. Position outlet pipe, fit bolts and tighten to 22 Nm (16 ft. lbs.).
13. Position alternator, fit bolts and tighten to 45 Nm (33 ft. lbs.).