Discovery II (LT) V8-4.0L (2002)
7. Remove intermediate gear assembly and collect bearings and selective spacer.
8. Secure gear assembly in a soft-jawed vice and using a suitable drift, remove and discard bearing tracks.
9. Up to 03 MY: Remove and discard circlips.
Reassembly
1. Clean gears, bearings, circlips and shaft.
NOTE: Intermediate gear cluster and bearing assemblies fitted to 03 MY transfer boxes may be fitted as replacements to pre 03 MY transfer
boxes.