landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Power and Ground Distribution > < Charging System - Alternator Cable Sleeve Splitting
Page 2
background image

4.

Install a new heat shrink sleeve onto the alternator cable. (Figure 1)

5.

Shrink the sleeve to the cable using a hot air gun.

6.

Connect the alternator cable to the alternator.

7.

Install the nut and tighten to 15 Nm (11 lbf.ft).

8.

Connect the battery ground lead.

Power and Ground Distribution > < Charging System - Alternator Cable Sleeve Splitting