L322 Range Rover System Description and Operation
AIR CONDITIONING
82-48
DESCRIPTION AND OPERATION
At a programmed parked heating/ventilation start time, or when parked heating/ventilation is selected on using the
MID/MFD, the instrument pack outputs:
l
A parked heating/ventilation request to the MID/MFD on the I bus
l
A parked heating/ventilation request to the ATC ECU and the Body Control Unit (BCU) on the K bus
l
Ambient and engine temperatures to the ATC ECU and BCU on the K bus.
On receipt of the messages:
l
The red LED on the MID/MFD panel flashes at 2 Hz to indicate that parked heating/ventilation is active
l
If the ambient temperature is less than 5
°
C (41
°
F), the BCU activates the door mirror heaters for 3 minutes
l
If parked heating is activated, the ATC ECU:
l
Energises the changeover valve
l
Sends a K bus message to activate the FBH
l
Operates the blower at speed 1
l
Opens the windscreen distribution flaps in the heater assembly and closes the face and footwell flaps.
l
If parked ventilation is activated, the ATC ECU:
l
Operates the blower at speed 1
l
Opens the face level distribution flaps in the heater assembly and closes the windscreen and footwell flaps.
When parked heating/ventilation is selected off, or after 30 minutes has elapsed, the instrument pack sends parked
heating/ventilation off messages on the I and K buses. On receipt of the messages:
l
The MID/MFD switches off the LED
l
If parked heating is active, the ATC ECU:
l
Sends a K bus message to de-activate the FBH
l
Switches off the blower
l
Returns the distribution flaps to the previous settings
l
After 3 minutes, de-energises the changeover valve.
l
If parked ventilation is active, the ATC ECU:
l
Switches off the blower
l
Returns the distribution flaps to the previous settings.
Remotely Selected Parked Heating/Ventilation
When parked heating/ventilation is selected on with the remote handset, the request is received by the FBH receiver
via the TV antenna and TV receiver. The FBH receiver relays the request as a hardwired signal to the FBH ECU. On
receipt of the request, the FBH ECU sends the request to the ATC ECU and the instrument pack on the K bus. Parked
heating/ventilation then operates as detailed above.