L322 Range Rover Service Procedures

ENGINE MANAGEMENT SYSTEM - V8
18-2-18 REPAIRS
Refit
1. Clean mating faces of throttle housing and inlet
manifold.
2. Fit 2 new throttle body seals.
3. Fit throttle housing to inlet manifold and tighten
4 bolts to 10 Nm (7 lbf.ft).
4. Connect multiplug to throttle body.
5. Connect air intake hose.
V8, REPAIRS, Hose - air flow meter to
throttle body.
6. If fitting a new throttle body, reset adaptions
using TestBook/T4.
Fuel rail - remove for access & refit
$% 19.60.04.99
Before disconnecting the battery, ensure all text and
cautions in the battery disconnection section are
observed.
GENERAL INFORMATION, Electrical
Remove
1. Disconnect battery earth lead.
2. Remove air intake hose.
V8, REPAIRS, Hose - air flow meter to
throttle body.
3. Remove LH ignition coil cover.
V8, REPAIRS, Cover - Ignition coils - LH.
4. Remove RH ignition coil cover.
V8, REPAIRS, Cover - Ignition coils - RH.
5. Disconnect multiplugs from ignition coils.
M86 5697