LR2 (LF) L6-3.2L (2008)
Torque:
5 Nm
5. Install the coolant hose.
6. Install the new gasket.
7. Install the dipstick tube.
Torque:
10 Nm
8. Install the intake manifold assembly.
9. Fill and bleed the cooling system.
10. Check and top-up the engine oil if required.