LR2 (LF) L6-3.2L (2008)
13. CAUTION: Cover fiber optic cable connectors to minimize dust ingress and avoid bending the cables in a radius of more than 30 mm.
14. Release the earth lead.
15. Release the instrument panel harness from the transmission tunnel.
16. Remove the auxiliary junction box access cover.
17. NOTE: LHD illustration shown, RHD is similar.
Release the instrument panel wiring harness.