landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Starter Motor > < Electrical, A/T - Battery Cable Routing With A/T R&R
Page 2
background image

3. Disconnect the battery positive cable from the generator. (Figure 1)

4. Remove the positive battery cable.

5. Install the new positive battery cable: (Figure 2)

^

Route cable as indicated.

6. Connect the positive battery cable to the generator:

(Figure 1)

^

Tighten nut to l2Nm (8.85lbf ft).

7. Refer to Workshop Manual, section 303-01: Engine - 3.2L NA-16, and install the intake manifold.

8. Refer to Workshop Manual, section 307-01: Automatic Transmission/Transaxle, and install the transmission.

Starter Motor > < Electrical, A/T - Battery Cable Routing With A/T R&R