landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Cooling System Pressure Test > < Cooling System Draining Filling Bleeding|Page 1291
Page 4
background image

 
 
26 .  Switch the engine off and allow to cool.  
 
 
27 .  Install the engine cover.  

Engine Cover - 2.7L Diesel (12.30.50)

  

 
 
28 .  Clean any remaining coolant from the chassis and surrounding area.  
 
 
29 .  Install the radiator access panel.  

 
 
30 .  Check and top-up the coolant if required.  
 

 

 

 

Hold the engine speed at 3,000 RPM for one minute.

 

 

Run the engine until the thermostat opens.

 

 

Remove coolant expansion tank cap, allow float to settle and top-up coolant if required. Install cap.

 

 

Tighten the 4 bolts to 10 Nm (7 lb.ft).

 

Cooling System Pressure Test > < Cooling System Draining Filling Bleeding|Page 1291