landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

AC Compressor|Page 2295 > < AC Compressor|Page 2293
Page 3
background image

 

Installation  

 

 

 

 

 

 

 

 

 

 

 

1 . 

  Install the new A/C compressor. 

  

If a new compressor is being installed, drain the required amount of refigerant oil from the 
new compressor. 

  

Tighten the bolts to 25 Nm (18 lb.ft). 

2 . 

  Connect the A/C clutch electrical connector.

3 . 

  Connect the refrigerant lines. 

  

Clean the component mating faces.

  

Install the new O-ring seals. 

  

Tighten the bolts to 10 Nm (7 lb.ft). 

4 . 

  Install the engine compartment upper LH heat shield.

5 . 

  Install the power steering pump mounting bracket.

  

Clean the component mating faces. 

  

Tighten the bolts to 25 Nm (18 lb.ft). 

6 . 

  

Install the power steering pump. For additional information, refer to 

Power Steering Pump - 4.4L 

(57.20.14)

 (Section 211-02) 

7 . 

  Secure the transmission cooler pipes into clips.

8 . 

  

Install the fender splash shield. For additional information, refer to 

Fender Splash Shield (76.10.48)

 

(Section 501-02) 

9 . 

  Install the splash shield.

10 . 

  Install the front wheel. 

  

Tighten the nuts to 115 Nm (85 lb.ft).

11 . 

  Lower the vehicle. 

12 . 

Fill the A/C system. For additional information, refer to 

Air Conditioning (A/C) System Recovery, 

AC Compressor|Page 2295 > < AC Compressor|Page 2293