Range Rover (LM) V8-4.4L (2009)
14. Secure the wiring harness.
^
Secure with a tie-strap.
15. Secure the wiring harness clips to the passenger side of the in-vehicle crossbeam.
16. Connect and secure the rear blower motor electrical connector.
17. Secure the wiring harness to the passenger side of the in-vehicle crossbeam.
18. Secure the gearshift interlock cable to the in-vehicle cross beam.
^
Secure with a tie-strap.
19. Connect the PATS module electrical connector.
20. Connect the audio wiring harness to the main wiring harness.
^
Connect the electrical connectors.
^
Secure the electrical connectors to the in-vehicle crossbeam.
21. Connect the main wiring harness to the A/C wiring harness.
^
Connect the electrical connectors.
22. Secure the wiring harness to the center of the in-vehicle crossbeam.
^
Secure the wiring harness clips.
^
Secure the wiring harness clip.
^
Secure with a tie-strap.
23. Secure the wiring harness to the driver side of the in-vehicle crossbeam.
^
Secure the wiring harness clips.
24. Install the in-vehicle crossbeam to bulkhead bolts.
^
Tighten the bolts to 25 Nm (18 ft. lbs.).
25. Install the steering column.
26. Install the windshield wiper motor.
^
Reposition the windshield wiper motor.
^
Install the bolts.
^
Tighten the bolts to 10 Nm (7 ft. lbs.).
^
Reposition the wiper linkage to its original position.
^
Install the windshield wiper motor to wiper linkage assembly nut.
^
Tighten the nut to 25 Nm (18 ft. lbs.).
27. Install the heater and evaporator core housing to bulkhead.
^
Tighten the nuts to 10 Nm (7 ft. lbs.).
28. Connect the A/C refrigerant lines.
^
Install the grommet.
^
Remove the blanking plugs.
^
Clean the component mating faces.
^
Lubricate and install the new O-rings.
^
Tighten the bolts to 25 Nm (18 ft. lbs.).
29. Connect the coolant hoses to the heater core pipes.
^
Remove the blanking plugs.
^
Install the rubber grommet.
^
Connect the coolant hoses and secure with the clips.
^
Remove the container.
^
Remove the coolant hose clamps.
30. Install the plenum chamber support.
^
Tighten the bolts and nuts to 10 Nm (7 ft. lbs.).
31. Connect the battery positive cable.
^
Tighten to 20 Nm (15 ft. lbs.).
32. Install the instrument panel reinforcement.
33. Recharge the A/C system.
34. Install the plenum chamber.
35. Connect the battery ground cable.