Range Rover (LM) V8-4.4L (2009)
CAUTION: Make sure that all openings are sealed. Use new blanking caps.
12. Remove the thermostatic expansion valve.
-
Remove the 2 bolts.
-
Remove the 2 air conditioning (A/C) pipe clamps.
-
Release the A/C pipes.
-
Remove and discard the O-rings.
13. Remove the evaporator core.
Installation
1. Install the evaporator core.
NOTE: Remove and discard the blanking caps.
2. Install the thermostatic expansion valve.
-
Clean the component mating faces.
-
Lubricate and install the new O-rings.
-
Install the A/C pipes.
-
Install the 2 A/C pipe clamps.
-
Tighten the screws to 6 Nm (4 lb.ft).
3. Install the heater and evaporator core housing lower cover.
-
Install the screws.
-
Install the clips.
4. Install the evaporator temperature sensor to the heater and evaporator core housing.
5. Connect the footwell duct actuator electrical connector.
6. Install the right-hand footwell duct.
-
Install the screws.
-
Install the clip.
7. Install the thermostatic expansion valve cover.
-
Install the screws.
-
Secure the wiring harness to the tangs.
8. Install the left-hand footwell duct.
-
Install the screws.
9. Reposition the heater and evaporator core housing for access.
10. Install the heater and evaporator core housing.
11. Connect the battery ground cable.