Range Rover (LM) V8-4.4L (2009)
Fuse Block: Service and Repair
Engine Junction Box (EJB)
Engine Junction Box (EJB)
Removal
1. Disconnect the battery ground cable.
2. Remove the engine control module (ECM) cover.
-
Remove the 10 screws.
3. Remove the engine junction box (EJB).
-
Disconnect the 4 electrical connectors.
-
Release the EJB positive battery cable.
-
Remove the 2 nuts.
CAUTION: Note the fitted position of the component prior to removal.
NOTE: Do not disassemble further if the component is removed for access only.
4. Remove the 5 relays.
Installation
1. Install the relays.
2. Install the EJB.
-
Tighten the nuts to 8 Nm (6 lb.ft).
-
Secure the EJB positive battery cable.
-
Connect the electrical connectors.
3. Install the ECM cover.
-
Tighten the screws to 2 Nm (1 lb.ft).
4. Connect the battery ground cable.