landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Procedures|Page 4643 > < Procedures|Page 4641
Page 9
background image

23. Install the ECM cover.

-

Tighten the Torx screws.

24. Connect the battery positive cable to the junction box.

-

Tighten the nut to 25 Nm (18 lb.ft).

-

Close the cover.

25. Install the A/C compressor and the A/C compressor mounting bracket.

-

If a new compressor is being installed, the required amount of refrigerant oil must be drained from it.

26. Secure the A/C compressor mounting bracket.

-

Tighten the bolts to 25 Nm (18 lb.ft).

27. Secure the A/C compressor.

-

Tighten the bolts to 25 Nm (18 lb.ft).

28. Connect the A/C clutch electrical connector.

CAUTION: Lubricate the new seals with clean refrigerant oil.

29. Connect the refrigerant lines.

-

Clean the component mating faces.

-

Install the new O-ring seals.

-

Tighten the bolts to 10 Nm (7 lb.ft).

30. Install the power steering pump.

-

Tighten the bolts to 25 Nm (18 lb.ft).

31. Connect the power steering pump high-pressure line.

-

Clean the component mating faces.

-

Install the new O-ring seals.

-

Tighten the union to 25 Nm (18 lb.ft).

32. Connect the power steering pump supply hose.

-

Clean the component mating faces.

-

Secure with the clip.

33. Install the accessory drive belt.

-

Rotate the tensioner assembly counter-clockwise.

34. Install the front wheel.

-

Tighten the wheel nuts to 140 Nm (103 lb.ft).

35. Install the cooling fan.
36. Install the air cleaner.
37. Install the engine cover mounting brackets.

-

Tighten the nuts to 6 Nm (4 lb.ft).

-

Attach the wiring harness connector blocks to the brackets.

38. Connect the suppressor electrical connector.
39. Install the purge valve assembly.
40. Connect the battery ground cable.

Tailgate Wiring Harness

Procedures|Page 4643 > < Procedures|Page 4641