Range Rover (LM) V8-5.0L SC (2010)
Installation
1. Install the pollen filter.
-
Secure the pollen filter housing cover.
2. Note:
Make sure thet the air inlet seals are fully seated before installation.
Install the plenum chamber.
-
Vehicles with diesel engine only: Attach the A/C line bracket.
-
Tighten the nuts to 10 Nm (7 lb.ft).
3. Install the hood seal.
4. Connect the battery ground cable.
5. Connect the hood support struts.