landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Brake Hose/Line > < Brake Fluid Accumulator|Specifications|Page 3486
Page 2
background image

3. Remove banjo bolt securing high pressure hose to pump. Collect sealing washers.
4. Connect pressure gauge to pump using LRT-70-003 through high pressure hose union.

NOTE:  Use original sealing washers.

5. Switch ignition on. Observe pressure gauge.

6. Pressure will rapidly rise to the accumulator precharge value, point X, at which point rate of increase will reduce as pressure rises to system

pressure of approximately 170 bar - see graph "A".

7. With a new accumulator, point "X" will occur at 80 bar.
8. Renew accumulator if point "X" occurs below 50 bar.
9. Depressurize system. Remove test equipment.

10. Using new sealing washers, position high pressure hose to pump. Secure with banjo bolt. Tighten to 24 Nm (18 ft. lbs.)
11. Align pump/motor assembly to mounting. Secure with nuts. Tighten to 8 Nm (6 ft. lbs.) 
12. Bleed brake system.

Brake Hose/Line > < Brake Fluid Accumulator|Specifications|Page 3486