Range Rover County LWB (LH) V8-4.2L (1993)
ABS Main Relay: Description and Operation
DESCRIPTION AND OPERATION
The Load Relay (K101) is energized when the ignition is in position II. Voltage from fuse F2 is now applied to terminal 9 of the ECU. This signals
the ECU to energize the Load Relay by applying voltage from terminal 8 to the coil of the Load Relay. With the Load Relay now energized, fuse
F1 applies voltage to the Warning Relay to energize through the NK wire.