Range Rover SE (LP) V8-4.0L (1995)
5.
Crimp a tinned ring connector to each wire.
6.
Slip the heat shrink sleeving over the crimp area, and shrink down using a heat gun.
7.
Unscrew the nuts from the terminal posts using an 8 mm socket. Retain the nuts and washers for installation, and discard the spade type terminals.
8.
Connect the ring connector to the studs on the coil using the original nuts and washers. Torque the nuts to 2.2-3.0 Nm (19-27 lbs.in.)
9.
Support the engine harness with cable ties to reduce the strain on terminals of the coil.
10.
Make sure that none of the terminals can short circuit on the PAS reservoir bracket.
WARRANTY
Normal warranty policy and procedure apply
COMP.CODE
1S6N
SRO
18.20.32 - Time: 0.50 hours
Install eyelet terminals