landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Starter Motor-PV8NA|Page 4640 > < Starter Motor-PV8NA|Page 4638
Page 2
background image

8. Release the starter motor.

^

Remove the starter motor retaining bolts.

9. Remove the starter motor.

^

Rotate the starter motor to access the electrical connector.

^

Disconnect the electrical connector.

Installation

All vehicles

1. Install the starter motor.

^

Clean the component mating faces.

^

Tighten the bolts to 45 Nm (33 ft. lbs.).

2. Connect the electrical connectors.

^

Tighten the starter motor nut to 10 Nm (7 ft. lbs.).

^

Install the terminal nut insulator.

^

Install the terminal cover.

^

Secure the electrical connector

Right-hand drive vehicles

3. Connect the steering column lower shaft.

^

Clean the component mating faces.

^

Install new patchlock bolt and tighten to 25 Nm (18 ft. lbs.).

All vehicles

4. Install the upper suspension arm and brake line heat shields.

^

Install the bolts.

^

Install the nuts.

NOTE: The heatshield consists of 3 parts.

5. Install the engine undershield.
6. Install the front wheel.

Starter Motor-PV8NA|Page 4640 > < Starter Motor-PV8NA|Page 4638