lincoln Workshop Repair Guides

Lincoln Workshop Service and Repair Manuals

Timing Cover|Installation|Page 1942 > < Timing Cover|Installation|Page 1940
Page 14
background image

38. If equipped, connect the PCV electrical connector.

39. If equipped, attach the block heater wiring harness retainer to the PSP tube and the power steering reservoir hose.

40. If equipped, attach the block heater wiring harness retainer to the upper intake manifold.

41. Raise the engine and transaxle assembly into the vehicle.
42. Install the engine mount, the nut and the 2 bolts.

^

Tighten the bolts to 55 Nm (41 lb-ft).

^

Tighten the nut to 63 Nm (46 lb-ft).

Timing Cover|Installation|Page 1942 > < Timing Cover|Installation|Page 1940