lincoln Workshop Repair Guides

Lincoln Workshop Service and Repair Manuals

Service Port HVAC|Description and Operation|Page 8481 > < Solar Sensor, HVAC|Locations|Page 8477
Page 1
background image

Service Port HVAC: Description and Operation

The high-side fitting is the largest. Special couplings are required to connect service equipment to both the high-side and low-side service ports. 

^

Quick disconnects must be used to connect a manifold gauge set to the system.

^

Always install the A/C charging valve caps on the service access gauge port valves after servicing the refrigerant system.

The service gauge port valves are either a one-piece or two-piece design:

^

In the two-piece design, the aluminum top portion of the valve is threaded to the bottom part and sealed with an O-ring seal. The valve seal is an
integral part of the aluminum fitting piece which must be replaced if the seal leaks.

Service Port HVAC|Description and Operation|Page 8481 > < Solar Sensor, HVAC|Locations|Page 8477