190D 2.5 (201.126) L5-2.5L DSL (602.911) (1987)
7 Thoroughly coat spiral at the end of the new cable with MB sliding paste, part no. 001 989 14 51 and introduce into the tube.
NOTE: When installing the cable ensure that the guide piece on the cable slides into the tube opening.
8 The cable must be pulled out with a max. force of 80 N. The test should be carried out with a spring scale.
9 Fully insert cable into the tube and press control switch "Roof lower" and allow cable to be pulled into the gearing until the bores of guide plate and
transport bridge are in alignment.